The project consisted of a metal building which housed sand, salt, and the airport's snow removal equipment along with miscellaneous storage. The building construction was comprised of a pre-engineered metal building with concrete reinforced side walls. The project was completed in 2003. The Architect of Record was Michael Baysinger while he was Principal/Owner of Lunsford Baysinger Architects.